Installations/Commissioning

Installation and commissioning of a coating line

Project from August 2021 till July 2022

The machine got 6 different coating heads for:

  • Silicone coating
  • Comma-bar coating
  • Hotmelt coating
  • Water based adhesive coating
  • Top coat
  • Primer coating

Additional features are:

  • Grooving station
  • Edge cutting device
  • Quality camera system
  • Coat weight control
  • Moisture control